Addition of 8 operating theaters as well as anaesthesia, recovery, ICU, CCU including;

  • Provision of heat load calculation;
  • Ventilation and air conditioning of the operating theatres with dedicated air conditioning system (air handling unit);
  • Provision of operating rooms’ pendant with required medical gases and lighting;
  • Provision of High Efficiency Particulate Arrestance (HEPA) filter and related UV;
  • Provision of medical gases for anaesthesia, recovery, ICU, CCU, emergency room;
  • Medical gas system and Pneumatic pipework design;
  • Compressed air, scavenger and vacuum system equipment sizing and selection;
  • Selection of AHUs, chiller, boiler, pumps, design and sizing the related system;