North Dandalup PC2 Laboratory

Client:  C.Y O’Connor ERADE Village Foundation          Year: 2018                   Value: $1m

  • Consultations and coordination with client to implement the client’s requirements and proposed recommendations
  • Engineering calculations for concept design complying with AS/NZS 2982
  • Provision of laboratories with positive/negative pressure
  • CRYO store room special exhaust design to comply with PC2 lab requirement
  • Make-up air system design for fume-extraction hood to enhance indoor air quality and comfort
  • Comprehensive final design documentation/specification and drawings for the mechanical/hydraulic systems
  • Technical consulting services and supervision at each stage of the project