North Dandalup PC2 Laboratory
Client: C.Y O’Connor ERADE Village Foundation Year: 2018 Value: $1m
- Consultations and coordination with client to implement the client’s requirements and proposed recommendations
- Engineering calculations for concept design complying with AS/NZS 2982
- Provision of laboratories with positive/negative pressure
- CRYO store room special exhaust design to comply with PC2 lab requirement
- Make-up air system design for fume-extraction hood to enhance indoor air quality and comfort
- Comprehensive final design documentation/specification and drawings for the mechanical/hydraulic systems
- Technical consulting services and supervision at each stage of the project