Design of the ventilation and air conditioning for 1300 m2 high school

  • Provision of heat load calculation;
  • Heating and air conditioning of the class rooms and library via rooftop ducted package air conditioning units;
  • Provision of duct design and AC units selection;
  • Provision of CO2 sensor linked to return/fresh air intake of the class rooms;
  • Provision of canteen’s canopy hood with make up air and extraction fan linked to gas regulator to open and run three system cuncurrently ;
  • Provision of ducted dual exhaust fan for toilets;
  • Provision of BMS to control operation day and hours of the air conditioning units and fans as requested by client for the energy saving;