• Refurbishment of 2000m2 office building (2 levels)
  • Provision of new concealed air cooled ducted fancoil units for over populated workstation areas;
  • Provision of upgrading and addition to the existing BMS to cater for the operation of the supplementary fancoil units based on temperature controllers and set points;
  • Provision of duty and stand-by ducted fancoil units in communication room linked to the condenser water loop;
  • Provision of CO2 sensor linked to return/fresh air intake of the supplementary fancoil units to optimise fresh air intake;
  • Relocation of the existing active chilled beam and related temperature sensors, adjusting the air flow requirement, addition of humidity controller and balancing/ recommissioning of the control system and BMS;