Design

  • Documentation
  • Heating, Ventilation and Air Conditioning (HVAC) / Refrigeration
  • Heat Load Calculation
  • Equipment Selection
  • Mechanical Specification Preparation
  • Different HVAC system design e.g.
  • Stand alone and DX systems VRF
  • Condensing water loop(Cooling Towers)
  • Chilled water
  • Chilled Beam
  • Chiller replacement
  • End of trip facility (EOT)
  • Filtration
  • Building Management Control System(BMCS)
  • General and LOcalised Dust & Fume Extraction System
  • Exhaust / Extraction and Pressurisation of Industrial Building
  • Commercial Kitchen Exhaust, Canopy Hood and Make-up air
  • Aged Care and Community Care
  • Sport and Recreation Centre

Management

  • SiteĀ Audit and Report Writing
  • Construction supervision
  • Project Management
  • Contract Management
  • Project Planning
  • Liaison with Client

Consulting

  • Recommendation and Equipment Selection
  • Project Review and Cost Analysis
  • Brief report writing
  • Cost estimate
  • CAPEX report writing
  • Dilapidation Report
  • Certificate of Design
  • Feasibility Studies